Yard OEE has crossed 80% for the first time — site throughput is now bottlenecked by piling crews, not fabrication.
Pulau Indah central fabrication yard OEE reached 81.4%, a record, driven by the new automated cutting and welding line. The constraint has shifted to civil piling crews on three Peninsular sites — meaning further yard capex will not unlock more site throughput.
Mobilising a second piling rig and accelerating the operator apprentice cohort will move the binding constraint outward and likely add another 5–7% effective site throughput ahead of the monsoon shutdown window.