Five-year revenue has more than doubled from RM 229M in FY2020 (WZ Satu era) to RM 560M in FY2024, with Construction & Energy now driving 73% of group earnings.
Group revenue compounded at ~25% CAGR from FY2020 (RM 229M) to FY2024 (RM 560M), led by Construction, Engineering & Concession (RM 312M) and Energy & Power (RM 94M). PBT swung from a RM 15M loss in FY2020 to a RM 54M profit in FY2024 — a clear post-rebrand turnaround after the WZ Satu years.
CEC order book stands at RM 780M anchored by the East Coast Highway Pkg 4B (RM 412M), MRT3 Pkg CMC-203 (RM 268M) and the SMR Defence Logistics Cluster (RM 184M). Energy pipeline now includes the 50MW LSS4 solar EPCC and a PETRONAS-backed green hydrogen pilot.